Overhead crane for metallurgy is applied in steel plant for handling of steel pipes, ladle, steel plate, coil, steel beam, bridge-crane-with-electromagnetic-beam.
When hardening doesn't go deep into the wheel tread, the crane wheel is subject to spalling—that is, metal fragments breaking off the surface and shortening
2 ton overhead crane is a kind of small overhead lifting equipment that The wheels use stainless steel wheels or nylon wheels to avoid friction during operation. AQ-LDY Metallurgical bridge crane is mainly used for lifting hot molten metal
Metallurgical Crane is the special lifting equipment for lifting molten metal (or Provide you with overhead crane, gantry crane, electric hoist, etc. of safe, reliable
We engineer and service single and double girder bridge cranes. North American By incorporating a pair of single flange wheels, the bridge crane can ride directly on top of our runway beam, without using a costly crane rail. The pendant cable has 2 steel wires built into the cable jacket for permanent strain relief.
Hot metal handling crane means an overhead crane used for transporting or pouring wheels, bearings, and axles which supports the bridge girders or trolleys.
The Steel mill overhead Crane is mainly composed of bridge, crab, connecting Steel works is one of the industries that use the most cranes. in many areas, iron and steel metallurgy crane can be used in the warehouse, petroleum, Horizontal rigid reinforcement of bridge frame; Adjust wheel span, diagonal and parity.
作者:A Bhatia · 被引用次数:2 — Appendix – B: STEEL BUILDING USING CRANE – GLOSSARY OF TERMS. Appendix – C: There are various types of overhead cranes with many being highly specialized, Single Girder Cranes - The crane consists of a single bridge girder bearings, sheaves, drums, wheels, rails, hoisting speeds, and beam and steel
作者:P Frankovský · 2020 · 被引用次数:6 — 200/50/12.5 t and a span of 18.6 m, working in a heavy metallurgical operation. of multiaxial stress states caused by both traveling crane wheel loads Load-bearing steel structure of the bridge crane with positioning of the
AQ-NLH double girder bridge crane is an European standard crane with AQ-YH series metallurgy steel wire rope electric hoist is the second Electric chain hoist is mainly consisted of motor, transmission mechanism and chain wheel, etc.
2017年10月9日 — Do you want to buy an overhead crane and want to know more about problems for gantry cranes, alloys, low-carbon steel, or medium-carbon steel. Wheels tend to wear out faster on a crane that was installed using an
The wheel or treadmill powered a drum, around which a rope was wound. By this time, steel rather than wood was used to build most cranes. Cranes tended to be built with the boom connected to a trolley, which could be moved easily An overhead traveling crane is a kind of bridge crane in which the rails are located
Metallurgical overhead crane can take part in specific process operation in the process of steel production. Casting overhead crane is used for lifting molten iron into mixer, steel-making furnace Previous « Basic Information on Bridge Crane standard overhead crane is mainly composed of motor, reducer and wheel…
2009年11月2日 — These cranes come in single- and double-girder bridge designs. Plenty of metal fabricating operations have overhead cranes, but do plenty of the floor, either connected to a set of tracks or on four wheels (see Figure 2).
The industrial overhead crane for Metallurgy is mainly used for transporting, pouring and charging hot metal in the process of smelting liquid metal, etc. Gantry Crane · Overhead Crane · Electric Winch · Hoist Wheel load. KN. 104. 111. 120.
In addition to standard cranes with welded box-section girders, we offer solutions with rolled steel sections, wall-mounted traveling cranes, and crane sets.