作者:T Tanizaki · 2006 · 被引用次数:29 — of the crane interference and then propose a heuristic algorithm to find a sub-optimal solution which Figure 2: An example of steel making process with cranes.
作者:T Tanizaki · 2005 · 被引用次数:29 — In this paper, we first present a formulation of the scheduling problem taking account of the crane interference and then propose a heuristic algorithm to find a
作者:T Tanizaki · 2006 · 被引用次数:30 — be concerned with positions of cranes in the house as well as time horizon. This scheduling problem with the crane interference was found in a few researches [3][
作者:W Liu · 2011 · 被引用次数:5 — In the steel making process if there are several overhead traveling cranes, it is proposed a forward heuristic algorithm to solve the crane scheduling problem.
作者:L Sun · 2018 — Production scheduling of steelmaking-continuous casting includes the and produce a scheduling scheme which is based on multiple heuristic algorithms.
作者:L Sun · 2018 — The results show that the method produced in this paper can smooth the schedule of Keywords—steelmaking-continuous casting; heuristic; crane; trolley
This priority propagation based collision avoidance mechanism is embedded into the decoding process of a memetic algorithm to ensure the feasibility of solutions
作者:J Yang · 2019 · 被引用次数:2 — The method to avoid the collisions between adjacent cranes is represented in Yu, S.P.; Chai, T.Y. Heuristic scheduling method for steelmaking and continuous
作者:H Missbauer · 2007 · 被引用次数:98 — continuous casting process – A case study from the steel-making industry. International The heuristic algorithm consists In section 6 the heuristic three-stage solution at the cranes are known and sequence-independent.
作者:Z Xua · 2021 — Keywords: operation optimization; steel manufacturing process; process simulation; lines, and then designed a heuristic solution algorithm integrating dynamic [90] proposed a simulation-based method for the multi-crane scheduling with.
simulation software tools, one based on a heuristic solution and one on machine method in the production of steel; the cranes must catch, hoist, and deliver minimization, bridge crane scheduling, genetic algorithms. The research was
作者:X Xie · 2014 — We consider a multi-crane scheduling problem commonly encountered in real warehouse operations in steel enterprises. Given some demanded coils, if a
作者:P Liu — The new scheduling problems arising from practical production processes have “Genetic Algorithm and Its Performance Analysis for Scheduling a Single Crane,” X. Xie them to develop an effective heuristic algorithm as initial solutions of the GA. In the paper entitled “Optimal Control Problem of Converter Steelmaking
encountered in real warehouse operations in steel companies' warehouses of In the heuristic algorithm program, for each crane, a detailed sequence specifies On the contrary, job scheduling problems in manufacturing have been studied.
Item 1 - 20 — Keywords: iron and steel industry; material handling; slab stack shuffling; heuristics. Introduction the slab yard makes it possible to schedule production in upstream and performed using bridge cranes over the slab stacks. The.
single crane scheduling problem motivated by batch annealing process in the iron and steel industry. A two-phase algorithm is constructed for the problem.
作者:X Xie · 2018 — In this paper, we deal with a three-crane integrated scheduling problem arising in a finery shop of an iron and steel making enterprise. It is commonly occurred in
作者:T Tanizaki · 2006 · 被引用次数:29 — of the crane interference and then propose a heuristic algorithm to find a sub-optimal solution which Figure 2: An example of steel making process with cranes.
作者:T Tanizaki · 2006 · 被引用次数:30 — be concerned with positions of cranes in the house as well as time horizon. This scheduling problem with the crane interference was found in a few researches [3][
作者:W Liu · 2011 · 被引用次数:5 — In the steel making process if there are several overhead traveling cranes, it is proposed a forward heuristic algorithm to solve the crane scheduling problem.
作者:L Sun · 2018 — Production scheduling of steelmaking-continuous casting includes the and produce a scheduling scheme which is based on multiple heuristic algorithms.
作者:L Sun · 2018 — The results show that the method produced in this paper can smooth the schedule of Keywords—steelmaking-continuous casting; heuristic; crane; trolley
作者:H Missbauer · 2007 · 被引用次数:98 — continuous casting process – A case study from the steel-making industry. International The heuristic algorithm consists In section 6 the heuristic three-stage solution at the cranes are known and sequence-independent.
作者:J Yang · 2019 · 被引用次数:2 — The method to avoid the collisions between adjacent cranes is represented in Yu, S.P.; Chai, T.Y. Heuristic scheduling method for steelmaking and continuous
作者:D Ouelhadj · 2003 · 被引用次数:55 — In the steel production process, the blast furnace continuously produces liquid iron developed in the previous objective, and the heuristics and schedule repair of steel that is transported by a crane to a ladle metallurgical facility. exact algorithms, heuristics, meta-heuristics (tabu search, simulated annealing, and.
encountered in real warehouse operations in steel companies' warehouses of In the heuristic algorithm program, for each crane, a detailed sequence specifies On the contrary, job scheduling problems in manufacturing have been studied.
作者:P Liu — The new scheduling problems arising from practical production processes have “Genetic Algorithm and Its Performance Analysis for Scheduling a Single Crane,” X. Xie them to develop an effective heuristic algorithm as initial solutions of the GA. In the paper entitled “Optimal Control Problem of Converter Steelmaking
作者:X Xie · 2018 — In this paper, we deal with a three-crane integrated scheduling problem arising in a finery shop of an iron and steel making enterprise. It is commonly occurred in
Item 1 - 20 — Keywords: iron and steel industry; material handling; slab stack shuffling; heuristics. Introduction the slab yard makes it possible to schedule production in upstream and performed using bridge cranes over the slab stacks. The.
single crane scheduling problem motivated by batch annealing process in the iron and steel industry. A two-phase algorithm is constructed for the problem.
作者:X Xie · 2014 — This paper focuses on a single crane scheduling problem which is motivated by cooled-rolling material warehouse in the iron and steel enterprise. As storage
作者:H Li · 2020 — In conclusion, it is of great need to develop an intelligent algorithm oriented to scheduling algorithm, which realizes the intelligent production, As to the scheduling based on heuristic algorithm, Ardalan et al. Effects of rolling process parameters on the mechanical properties of hot-rolled St60Mn steel.
作者:V Galle · 被引用次数:34 — We model this new problem using a binary integer programming formulation Hence, we provide a heuristic procedure to generate promising solutions in a Algorithms are tested through computational experiments in Section 6. This section first reviews previous work in Yard Crane Scheduling (YCS). steel plants).
作者:L Sun · 2017 · 被引用次数:8 — heuristic algorithm to solve the SCC rescheduling problem. The scheduling of steelmaking-continuous casting (SCC) process is a hybrid Crane moves later-.