A GW Becker 110/30t ladle crane working at a steel manufacturer's teeming aisle. BHS Shanghai's plant manufactures more than 500 corrugated production units
This new crane is a replacement for an antiquated unit in the customer's teeming aisle. This high-speed, 230 VDC, 4-motion continuous severe service EOT crane
The charging crane, ladle crane, teeming crane, and tundish crane are all quite similar and can be defined by their location and function in the plant.
The ladle handling crane transports ladles filled with molten iron to the basic oxygen furnace (BOF), or molten steel from the BOF and electric arc furnace
GH is a leading manufacturer of steelworks and steel mill cranes for material handling solutions that can be designed and adapted to be used in a wide range
The teeming aisle girder changes occurred in front of three steelmaking during the work; ladle transfer cars, overhead crane movements, the use of ladle
occurred in the steel industry relating to cranes: operator fall hazards; charging the EAF/ladle handling; and non-routine procedures. These five areas.