2. All metallurgical bridge cranes must be equipped with lifting limiter with reliable alarm and restriction functions. 3, The hoisting mechanism of the double
According to the application, structure and technical requirements of 320/50t-22m large quenching crane, the general structure and hoisting mechanism of
Our company mainly manufactures metallurgy cranes with lifting capacity of 1-10t also can design and manufacture according to requirements. Applications.
Weihua Metallurgical Overhead Crane is mainly used for lifting molten This crane designs with FEM/DIN standard with compact and low headroom structure.