Journal of the Operations Research. Society of Japan. 2006, Vol. 49, No. 3, 188-201. A HEURISTIC SCHEDULING ALGORITHM FOR STEEL MAKING. PROCESS WITH CRANE
In the process of steelmaking and continuous casting production, an optimized ladle schedule will greatly reduce energy consumption and improve production.
This paper presents an effective scheduling in a steel-making continuous casting (SCC) between a standard genetic algorithm (GA) and a heuristic method.
In steelmaking–continuous casting, a ladle corresponds to the furnace heuristic ladle selection method was studied for different scheduling order method
A review of previous research on integrated steel production plan- ning and scheduling can be found in Tang et al. [2]. Because steel- making scheduling