During the overhead crane installation, The crane is mounted on the gantry using another piece of lifting equipment. The lifting equipment chosen to do this job
2. Hoist unit of single girder cranes will always be dispatched duly assemble with girder. For double girder cranes dispatched in dis assembled condition, after
Single and Double Crane Designs. Where single girder cranes operate on one bridge beam with a hoist connected to its lower flange, double girder cranes span