These two-stage scissor lifts are designed to withstand harsh melt shop environments. Since developing this solution in the early 80s, Handling Specialty has
Casting Bridge Crane Lifting Ladle. YZ Steel Mill BOF Furnace Four Girder Heavy Duty Molten … YZ is the general model name for ladle crane whose capacity is
Abstract: To revamp a blast furnace (BF) is required about every 15 years, and revamp duration by a conventional method is around 130 days. JFE Steel has
For the construction of a new steel mill, Nucor Corporation was planning to stick-build the mill's entire furnace. Mammoet came up with an alternative and
At SSAB's sheet steel mill in Luleå, Sweden, great care is given to the 15 overhead process cranes that transport and tip 100-plus-ton ladles of molten
Since 1941, IHI has built and relined over 90 blast furnace plants in and Electric arc furnaces produce steel, using scrap as raw material and have been
Steel Melting Shop (SMS) receives Hot Metal (HM) from Iron-making units from BOF Ladle Furnace utilizes electric energy& graphite electrode to raise &.
A prime example is the hot rolling process which starts with heating 8-inch thick slabs of steel in a furnace to about 2250°F. Next, the pieces pass through the