Moving a load horizontally, vertically or at other angles and possibly through different floor levels, by use of different lifting and hoisting equipment.
Subtracting the mass of the hook block and lifting slings from the capacity of the crane at the particular radius. This should be noted on the load chart. For
Mobile cranes with a maximum lifting load of 3 tons or more Lifts for construction work with a guide rail height of 18 meters or more (excluding a lift
There are different types of mobile crane. The specific operating instructions for a particular manufacturer and model of crane should be referred to. This
Load Path interaction with working zones and site boundaries (multiple principal contractors). • How to programme a lift (daily/ weekly crane coordination.