Compared with actual situation of the current thermal power plant, this paper studies operation process of coal handling system in thermal power plant.
Business Challenge: COAL HANDLING SYSTEM (CHS) is a Turnkey package for Stacking, Reclaiming and conveying coal to Bunker Unit (BU). The material to be handled
Energy Audit coal handling plant of Coal Fired Thermal Power Plant has been considered out. The aim is to calculate all the losses and give measures to rectify
A detailed review of the coal handling plant, conveyors and chutes was carried out. The solution was to connect the Reclaim conveyor to the Stacker conveyor
Every thermal power plant is equipped of a large CHP where coal is handled. Such plants consume large quantity of water in order to suppress dust properly which