The algorithm is characterized by restricting search space and using hybrid method of depth-first search and width-first search on an enumeration tree for crane
Tanizaki et al. (2006) report an heuristic scheduling algorithm for a steelmaking process that is modelled as a multi-stage job-shop process with crane handling
[86] abstracted the steel production scheduling problem as a mathematical model of multi-stage job scheduling and crane scheduling. A two-dimensional time-space
Research on the Crane Scheduling for the Process of Steelmaking-continuous Casting based on Multilevel Heuristic Algorithm ; USB ISBN: 978-1-5386-4474-4 ; Print
The effective transportation of slabs contributes to an increase of the customer satisfaction. 1. Introduction. In recent years, the steel manufacturing process
As constraints, there is a con- straint on the processing flow according to which each charge moves on through the predetermined manufacturing processes suc-.
A heuristic scheduling algorithm for steel making process with crane handling Steel making process is also modeled as of a multi-stage job-shop process