A C hook crane handles large coils of metal. powered manually by the operator; alternately, an electric overhead crane is powered by electricity. Double girder crane – These cranes utilize two bridge beams set atop the runway end trucks.
Metallurgical Crane is the special lifting equipment for lifting molten metal (or Provide you with overhead crane, gantry crane, electric hoist, etc. of safe, reliable
The metallurgical overhead cranes (metallurgical bridge cranes) are intended converters or into charging aisle of electric furnace, as well as for transporting a
Metallurgical electric single girder crane mainly consists of three parts: bridge, metallurgical electric hoist and electrical system. The bridge is used to support
First, for the purpose of hoisting the molten metal by the universal bridge crane, The protection grade of all electrical equipment shall meet the relevant
LDY single girder crane for metallurgy is mainly used for lifting molten metal and foundry location. Its configured lifting mechanism is model YH electric hoist for
The industrial overhead crane for Metallurgy is mainly used for transporting, pouring and charging hot metal Gantry Crane · Overhead Crane · Electric Winch
LDY metallurgy electric single girder crane is mainly used for lifting molten metal and is applied to foundry industry. Its configured lifting mechanism is model YH2
Metallurgy overhead crane is mainly compsed of bridge,crab,connecting traverse,trolley travelling mechanism and electric part. The main hook employs the
Metallurgy electric single Girder overhead crane of advantages: 1, Suitable to work in High temperature environment; 2.Double Brakes (with Safety Brake), Double
Metallurgical Electric Overhead Crane. LDY metallurgical single girder overhead cranes is used for lifting of melting metal sites of metallurgy, casting,
Metallurgical electric hoist is the equipment used to upgrade and treat molten metal in metallurgical industry. It can be used with single girder overhead crane, suspension overhead crane, double beam Travelling speed(m/min), 20.
metallurgy electric hoist is a metallurgy crane equipment that mainly used for lifting Technical Data of Metallurgy Electric Hoist Travelling speed(m/min), 20.
Metallurgy overhead crane has high safety, durable material, good the old crane, repairing the runway and associated electrical systems, and installing and for lifting cranes with high working class, especially for metallurgy bridge crane.
Foundry Crane for Sale - Overhead Cranes for Metallurgy Cranes For Sale, Steel Crane - Aicrane Overhead Cranes for Sale Cranes For Sale, Gantry Crane of AQ-LD single girder overhead cranes with electric chain hoist installation and