Using metallurgical lifting special motor, when the environment temperature is more than 40 degrees, the H class insulation motor should be selected. Installed with two sets of independent brake (double brake); The weight limiter must be installed.
(A) has been used for general overhead crane lifting molten metal, shall be replaced in order to comply B/T7688.15-1999 "Metallurgical ladle crane technical
Technical requirements for metallurgical crane The main lifting mechanism should be 2 sets of driving system,When one set of drive system failure occurs,the
hoisting system of metallurgical bridge crane. 1. The environmental temperature of metallurgical bridge cranes is higher than that of the general environment.
should be replaced with a casting crane that meets the requirements of JB/T7688.15-1999 "Technical Conditions for Casting Cranes for Metallurgical Cranes".
作者:X Wu · 2011 · 被引用次数:6 — According to the application, structure and technical requirements of 320/50t-22m large quenching crane, the general structure and hoisting mechanism of crane
Overhead crane for metallurgy is applied in steel plant for handling of steel pipes, Main lifting mechanism lifts goods with fast speed to meet the requirement of The hoisting mechanism of the ladle crane adopts redundant system design to
Working environment temperature is -10 DC to 60 DC; relative humidity is not more than 50% in 40 DC. Design and manufacture of crane meet the requirements of
作者:P Frankovský · 2020 · 被引用次数:6 — Faculty of Mechanical Engineering, Technical University of Košice, 200/50/12.5 t and a span of 18.6 m, working in a heavy metallurgical operation. crane was required, meaning that the main lift beam needed to be closed.
Oct 27, 2017 · Bridge cranes for metallurgical industry are mainly used for the that meets the requirements of JB/T7688.15 – 1999 metallurgical crane technical
Emergency stop system,. Current overload protection system and etc. Design and construction rules. All the standards which is required for the crane is the
2019年10月1日 — Below -40° F (-40° C) there is a significant risk of parts of the system not test which measures the energy required to break a sample of the steel at the team of Özkan Kosmaz, R&D manager, Metallurgical Engineer, MSc.;
Metallurgical pouring bridge crane Technical parameters.jpg manufacturing process, as well as individual requirement according to the technical specification.
Metallurgy crane is one of the main production equipment in the smelting workshop. This crane has separate driving system for main and ancillary trolleys.