LDY single girder crane for metallurgy is mainly used for lifting molten metal and foundry location. Its configured lifting mechanism is model YH electric hoist for
Overhead crane for metallurgy is applied in steel plant for handling of steel pipes, ladle, steel plate, coil, steel beam, bar, etc. with hook, grab, clamps,
Product Name: Manual Single Girder Overhead Crane. Lifting Capacity: 1-10t. Lifting Height: 3-10m. Work Duty: A1-A3. This manual type single girder overhead
Manual overhead crane is divided into manual single-girder overhead crane and manual double girder crane, gear and wheels running driven by drive chain,
2017年11月1日 — Chain hoists use metal chain as the lifting medium and perform the lift by pulling the chain through sprockets and then deposit it into a container.
tical loads will be placed on the overhead crane system. "by making it single ensure the absence of lamellar tearing in the base metal and the soundness of
R&M hoist. Manuals. Need a manual for your R&M product? We make it easy and quick for you to locate and find the correct one. I am interested in Electric
Metallurgical Crane Technical Requirements First, for the purpose of hoisting the molten metal by the universal bridge crane, it should be this procedure, after the transformation of the crane, must pass the inspection agency qualified in
For tube widths greater than 6”, metal End Covers are provided. Use supplied #6-32 hardware to install these (see Diagram 8B). Diagram 8A. End Plug Installation
warranty on manual systems, and a one-year warranty on motorized systems. A Spanco worker in. Las Vegas welding the. A-frame on an Aluminum. Gantry Crane.
A C hook crane handles large coils of metal. Overhead cranes have high lifting capacities for load movement. Crane travel is directed by an operator, either manually or with a wired pendant station or wireless controls that guide their
Metallurgical Single Girder Crane supporting the use of metallurgical hoist which Manual overhead crane is divided into manual single-girder overhead crane
1974年12月13日 — running overhead crane that is controlled by an operator on a floor or independent (7) The manual provided by the crane manufacturer shall be core shall be used on all molten metal applications and in an area where the
7.7.1.2 Putting the manual operating terminal into operation. 66. 7.7.1.3 When the bridge is removed and the emergency stop is actuated for min. 5 sec- onds corrosion on plastic (identifiable by dull, sooty or brittle surfaces) and metal.
This single girder overhead crane is manufactured according to FEM/DIN standard. Delays are costly: a fast, reliable crane will deliver the right metal to the smelter Safety Manual for Overhead Crane Operators Forward An overhead crane