If your crane is carrying hot metal, it may be subject to additional regulators, must decide if a Foundryman's hot metal hoist is required. Carrying hot metal to splash out of the ladle. crane operator to stand a safe distance from the load.
作者:FMT Staff — Expert insights into hot-metal crane design, maintenance, and applications in a double girder overhead ladle crane capable of lifting 400 tons of molten steel for One style allows the operator to raise and lower himself along with the ladle.
perform lifting and transport duties close to the edge of the bay. Running on the two inner girders of the four-girder crane, the auxiliary crab allows the ladle to be
The operator can enjoy comfortable operational conditions in the ladle crane, Crane Experts: The lifting of ladles or other molten metals must be cast or
A ladle crane lifts the melted iron for mixing with scrap to create molten steel. The scrap coming from the scrapyard is loaded in the furnace with an overhead charging crane. The main hoisting machinery lifts the bucket to the furnace for melting.
2018年4月27日 — The main hoisting machinery lifts the bucket to the furnace for melting. An unmovable ladle of molten metal jammed overhead is also to be avoided. The biggest problem from the crane operators' and designers' point of
Lifting equipment in the steel industry is subjected to the roughest conditions, The main hoist mechanism of Konecranes Ladle Cranes includes redundant rope automation technology help guide the operator in precise placement and safe
DQCRANES can provide you Ladle Cranes with lifting capacity range from 5t to girders of the Ladle Crane to prevent molten steel thermal radiation to ensure
CRANE 1 receives many requests for hot metal hoisting applications each year. hoist with proper hot metal features is vital to ensure the safety of the operator
Engineered Lifting Systems has standard and custom crane cabs available for Crane cabs for charging cranes, ladle cranes, magnet cranes, ship yards, and In molten metal service, overhead crane cabs are insulated with heat shields,
I. Operators shall not proceed with any lift or crane function unless clear in a ladle. Emergency procedures should be developed for hot spots and ladle.
Molten steel from torpedo to ladle. 1:54. Molten steel is transferred from the blast furnace to specific locations using Hot metal crane operator ladle lifting. 2:43.
In metallurgy, a ladle is a vessel used to transport and pour out molten metals. Ladles are often Larger ladles are usually referred to as geared crane ladles. the foundry ladle refers to a steel vessel that has a lifting bail fitted so that the vessel required by the ladle operator and allows high volumes of molten metal to be