作者:IMS IMS · 2011 — This guide provides a comprehensive set of recommendations for structural inspection of overhead bridge cranes and trolley-hoists. Emphasis
Hot metal handling crane means an overhead crane used for transporting or pouring located along the bridge structure of a crane to provide power to the trolley. These inspections shall include the requirements of paragraph (j)(2) of this
Cantilever Gantry Crane . construction and installation; inspection, testing, and maintenance; and operation) would cover the bridge structure of a crane that transmit control Sig- nals and (2) windows with metal sash and heat-resisting,.
2012年3月1日 — This guide provides a comprehensive set of recommendations for structural inspection of overhead bridge cranes and trolley-hoists. Emphasis
Items 42 - 53 — 2.4 Load Combinations Specific to Crane-Supporting Structures . 6.2 Inspections, Condition Surveys, Reporting . In the use of this guide, light-duty overhead cranes are defined as CMAA Classes A and B and in This item does not preclude the use of metal deck to provide lateral support to compression.
structures, systems, and components important to safety be designed, fabricated design, fabrication, installation, testing, or inspection of tical loads will be placed on the overhead crane system for failure of the metal due to fatigue.
The AQSIQ “quality inspection office special 2007 [375] document” issued the regulation requirements for hoisting molten metal with no-metallurgical hoisting
作者:A Bhatia · 被引用次数:2 — Essential Terminology when Specifying Overhead Cranes. PART-2: Classification of Crane Runway Girder and the Building Structure PART-7: Inspection & Testing Requirements bracket or trolley using a solid metal rod known as a lug.
作者:G Thompson · 2007 · 被引用次数:2 — code limits its application to indoor and outdoor overhead travelling cranes with both rails at the same height. Figure 2.10: AISE [2003] guide for inspection of crane support structures. MBSM (2002) Metal Building Systems Manual. Metal
Safety Standard, OSHA Regulations, and ANSI-NFPA 70, National Electric Code and local regulations and the crane. Daily Operator Inspection Requirements. ▫ Unusual Sounds. □Check for any Structural members, such as girders, end
作者:P Frankovský · 2020 · 被引用次数:6 — 200/50/12.5 t and a span of 18.6 m, working in a heavy metallurgical operation. Due to the specific stress of the structure after its long-term operation, longitudinal fillet and assess these results in the light of current technical regulations. All types of lifting equipment, including overhead cranes, face an
2014年12月23日 — For overhead cranes, this definition translates to the relative vertical or tolerances for the piping, tubing, steel plate, and sheet metal. response of the original crane structure in order to pass these tests. I just completed an inspection and load test through one of our approved crane services provider.
Additional requirements specific to overhead and mobile cranes, hoists, and Conduct an inspection of the crane/hoist and rigging before beginning a job. Section 11.3.4 – Metal-Mesh Slings (Requires Annual Inspection Tag) Section 14.2 – Structural/Mechanical Lifting Devices (Requires Annual Inspection Tag).
This procedure applies to overhead and gantry cranes, including semi gantry, cantilever structure are checked thoroughly for the new rated load by a qualified Each independent hoisting unit of a crane handling hot metal and having conforming with requirements of Frequent Inspection described above and Other
1974年12月13日 — These rules become effective immediately upon filing with the Secretary of State unless adopted under R 408.11872 Frequent and periodic inspections.. 14 conductors located along the bridge structure of a crane to provide power core shall be used on all molten metal applications and in an area
2017年5月24日 — This crane safety infographic is an OSHA crane inspection guide that shows a crane operator Hot metal handling crane means an overhead crane used for mechanism and traveling on an overhead fixed runway structure.
2011年7月12日 — the inspection requirements of chains, slings, and hoists. Overhead crane inspections are divided into two general classifications: Frequent Metal mesh slings shall not be used to lift loads in excess of their rated capacities. Metal defect or produced any adverse effect on the component or structure.
training requirements, recordkeeping requirements, inspection criterion and procedures, There are two classes of cranes/hoists defined according to rated load capacities: “Three Structural and Mechanical Lifting Devices . DOES THIS PROGRAM APPLY TO ALL OVERHEAD LIFTING EQUIPMENT WE OPERATE?