Foundry Crane is also called Ladle Crane, it is large casting lifting equipment on lifting Four-beam six-track double trolley is generally used for large-tonnage
Oct 27, 2017 · Bridge cranes for metallurgical industry are mainly used for the metal smelting, rolling The three-beam four-track forging crane made by Henan Weihua is another masterpiece after the YZ320t four-beam six-track casting crane.
The double girder two-rail ladle crane and double the four girders four rail ladle User-friendly CMS monitor and management system. 6.Customer: What is the difference between a crane metallurgical crane and a conventional crane?
Metallurgical Crane is a special crane for lifting the molten metal and molten metal forging clasps. Two crane gider with two rail or four girder with four rail (for 125t above) PLC control and failure detection, display, record and printing system; 6. Prevent collision between cranes of same span. Steel Track Recommend.
There are mainly four styles for the crane: double girder double track, double girder four track, four girder four track and four girder six track. Ladle overhead
QDY series double girder ladle overhead crane is a heavy lifting equipment used ladle crane, four-girder four-rail ladle crane, four-girder six-rail ladle crane. Track type, P43, P43, P43 or QU70, P43 or QU70, P43 or QU70, P43 or QU80, QU100 The motor protection grade IP54, using specially designed metallurgical
foundry overhead crane double girder overhead crane casting overhead crane girder double-track,four beams and four tracks, four beams and six tracks . is improved on the basis of AQ-QD overhead crane so as to used in metallurgy.
An overhead crane, commonly called a bridge crane, is a type of crane found in industrial 2 Applications; 3 Gallery; 4 See also; 5 References; 6 Standards; 7 External carried on an annular track; the bridge traverses the circular area beneath. (device) mounted on a trolley that can be moved across the bridge beam.
China Qdy Type Used in Special Condition Metallurgical Crane, Find details about China Overhead Crane, Ladle Crane -four-girder six-rail typethe (lade cranes with extra lifting capacity) Dteel track, Trolley, kg/m, 18kg/m, 24kg/m, 43kg/m.
If you need a 5-ton bridge crane for your metallurgy industry, your coal mine, workshop, AQ-HD 5 Ton Single Girder Overhead Crane Parameters into a double girder double truck, four beams and four tracks, four beam rail and other types.
The ladle crane structure forms mainly consist of four-beam and four-track double trolley, four-beam and six-track double trolley for crane load capacity over 200
Model 4 Mobile Harbor Cranes · Model 5 Mobile Harbor Cranes · Model 6 This type of end truck is used when more than four wheels are required on a BRIDGE: The part of a crane consisting of one or more girders, trucks, end RAIL, RUNWAY: The track supported by the runway beams, on which the crane travels.
by P Frankovský · 2020 · Cited by 6 — 200/50/12.5 t and a span of 18.6 m, working in a heavy metallurgical operation. bridge, gantry and tower cranes, crane tracks, road and railway bridges in crane runway girders being travelled over by wheel loads, and in [4] addressed a fatigue evaluation ˇCernecký et al [6] studied beams and their.
by JC Warren · 2012 · Cited by 1 — Path of design development in overhead crane systems pp. 98. 12. Reasoning to bring 7.3 Bending Shear Stress Distribution Diagram for Girder Cross-Section pp. 25. 7.4 Girder Loading 2.2 Metallurgy Overhead Crane pp. 11 4. Top-right web/flange intersection. 5. Bottom-left web/flange intersection. 6. Bottom-right
Single girder bridge crane is widely used in workshop, warehouse, and material field for machinery manufacturing, metallurgical, petroleum, The trolley of singer girder crane is often assembled with manual hoist, electric 12.5, 7.5, 6 9 12, A5, 0.66/4, 740, 3545, P38, 12.8, 65.8, 1025, 515, 695, 1050, 120, 2000, 2674.
by H Patel · 2008 · Cited by 3 — design optimization is made by altering the dimensions of gantry crane girder It moves on wheels or along a track Patil P. and Nirav K. [4], in “Design and analysis of major components of 120T capacity of EOT crane” analyzed various (2013) [6], in this paper the design optimization of double box girder has been done
There are mainly four styles for the crane: double girder double track, double girder four track, four girder four track and four girder six track. Ladle overhead