作者:K Kishore · 2020 · 被引用次数:5 — Failure of 24 T coil handling crane hook led to safety concerns. Failure occurred in high cycle fatigue mode confirmed by very fine striations. Presence of severe sulphide and titanium nitride inclusions aggravated the situation. Tool marks led to easy crack initiation by severe stress intensification.
2020年11月5日 — The role of metallurgical abnormalities like non-metallic inclusions has been discussed. Finite element simulation for crane hook confirmed that
Current work presents analysis of a failure of 24 T crane hook using multi-disciplinary approach involving perspective of on-site observers, metallurgical
作者:S Das · 2018 — The metal in the hook was revealed by chemical analysis to be killed IS: 4367. 20C15 steel. The hook microstructure with a mixture of ferrite and pearlite (which meant lower fatigue strength). In this study a 40 ton crane hook has been analysed which failed during lifting of 24 ton coil at a Hot Strip Mill (HSM). There was
Design and Analysis of Crane Hook – Review – IJERT Orion Crane Failure Update - Crane Hook perspective of on-site observers, metallurgical investigation and finite element analysis. Failure analysis of a 24 T crane hook using multi .
The failure was associated with a surface defect, and it was recommended that the Cranes, Hooks, Surface defects, Mild steel, Brittle fracture to transport ladles of molten metal, then exposure of the hook to radiant heating may have It was then artificially aged at 250°C for a total of 24 hours, after which the tensile test
The Forging Crane Hooks are designed by using a high-quality single piece of Steel Only $2.99/month. you will probably have to create several work planes, This may causes fatigue failure of the crane hook but the load cycle frequency is very low [6]. Static crane, as its name suggests, don't show much movement.
To minimize the failure of crane hook, the stress induced in it must be studied. At the optimization stage, a multi objective genetic algorithm (MOGA) Rashmi Uddanwadiker (2011), studied stress analysis of crane hook using finite were: wind tunnel testing, structural analyses of the boom, metallurgy of failed parts from
作者:R Sharma · 2013 — Crane Hook is highly liable component and is always subjected to large amount of stresses which can eventually lead to its failure. Finite Element
This paper summarizes several cases of metallurgical failure analysis of 3D modeling and finite element analysis for the chain, used in a crane hook, Expressions for system reliability, RY(t), and mean time to system failure, MTTF are derived. The traditional method yielded 24 failures with an RPN ≥300, of which 22
2015年8月21日 — The crack is intergranular, which is consistent with stress corrosion cracking of an alloy steel. Stress corrosion occurs when a susceptible material
r\lg~ 9:r:t'f~.!It'~ UFES. ,. r:::'.~~ '.: .. ,. Preparing a book on metallurgy of failure analysis with problems and optimum solutions The fault-tree analysis has multi-faceted applications. (GrossKreutz identified the process24 as stage I of the crack propagation). Fig.7.27 Intergranular cracking with lifting of crystals (x 100).
OVERHEAD AND GANTRY CRANES . The safety policy “lf It's Not Safe, Don't Do Every rope is subject to metal fatigue from bending hook or pin with a body diameter larger that the pull is against the choke in a multi-leg lift. causes doubt as to the strength of the sling. The failure of a the other direction (24).
作者:R Uddanwadiker · 2011 · 被引用次数:32 — amount of stresses which can eventually lead to its failure. To study verified for its correctness on an acrylic model of crane hook using Diffused light Polariscope set up. By t whe stress, t = thickness of hook. duced during finite element analysis are compared with in casting the molten metal when solidifies, it has some.
These are the causes of fatigue failure of the crane hook. To minimize Then estimated the location of stress after Appling the 2-ton load using FEM. They.
single fall products (overhaul balls or swivels) and multi fall products. (crane blocks, hook blocks) are designed and finished. a failure during operation can have disastrous proportions. detailed lashing limits analysis should be under- T d. B. TL. L. O. Z. TB. D2. D1. □. Double hook. □. Double hook with shackle hole.
2020年5月4日 — supposedly the hook failed and boom slingshot over the top. Apparently this crane has no counterweights and uses water pumped into ballast tanks. The hook falls off and the block doesn't move for several seconds. It's clear that is the motion of the vessel which causes the crane jib to flex back until it
Laminated Crane Hooks are a little more complex, and are comprised of several steel plates riveted together to ensure higher stress resistance and increased
unloading occur the failure of hook take place, but in laminated hook when crack or faults meshing is done, FEA analysis(ANSYS 14.0) carried out. A crane hook is usually equipped with a safety latch to prevent the disengagement of the pouring of hot metal ladles. laminated hook are made of plates which are rivet