Workers use a crane to load a 60000 pound coil of steel from Holland onto a railroad car for shipment to Ford Motor Company in Ohio from a warehouse at the
The crane operator waited for acknowledgment to proceed and lifted the load around 60cm higher before continuing movement. The crane operator saw the worker
WorkSafe Connects Slewing Crane up to 60 course requires the operator to plan the work, conduct routine checks, set up crane, transfer loads, mobile loads and
Take up slack on the sling gradually. Avoid lifting or swinging the load over workers below. • When using two or more slings on a load, ensure that they are all
(c) a tandem lift involving the simultaneous use of more than two cranes, come within 60 cm (2 ft) of any obstruction in any area accessible to workers.
Never use two pieces of equipment to lift a load greater than the rated cover when a crane is taken out of production for maintenance work and is under