A workover rig is used to retrieve the sucker rod string, pump or production tubing from the well or run wireline cleaning and repair equipment into the
Coiled tubing special services can be used in well control by establishing This can replace common workover equipment and the wire rope workover rig to
A contract for the project operations is set up with the CTD contractor and the planned objectives presented, as well as personnel and equipment requirements.
The rapid-deployment trailer mounted coiled tubing unit operates with one unit layout and effective use of technology enables quick rig up and rig down.