Jul 12, 2017 - CWD crane can lift goods of 5 tons to more than 600 tons according to different configurations. It can also meet the personalized needs of
DOUBLE GIRDER CRANE – A crane which runs on two (2) bridge girders mounted between and supported by end trucks at each runway. DRIVE GIRDER – The girder on
Drive girder (G-1):. The girder on which the bridge drive machinery is mounted, on double girder cranes only. Drum: The cylindrical member around which the wire
A Top Running Double Girder (TRDG) bridge crane is similar to a TRSG crane, except for an additional bridge beam. The additional girder increases the capacity
With a top hook on the crane hoist frame/body, the hook mounted crane hoist can be suspended hoist from the clevis or suspension pin of a trolley; or a fixed
Bridge means that part of a crane consisting of girders, trucks, the end of its permitted travel; or when two moving cranes or trolleys come in contact.
Double Girder Cranes – This type consists of two bridge girders supported on Considering that the pin is under double shear and using a factor of √3 to
BLOCK-UPPER: The assembly consisting of the sheaves, pin and bearings mounted to the trolley frame, and which support the hoisting ropes. BRAKE-HOIST HOLDING: A