Static tests of the full gantry crane and the transshipment crane must be conducted in the same way as the inspection of the overhead crane; however, each
After 10 minutes the load is lowered, and then the crane bridge is verified Crane deemed to pass the static tests, if within 10 min the lifted load does
Load Test. Material Handling Systems has many years of experience performing certified static and operational load testing for the following: Overhead Crane
The CHALLENGE. Our crew is used to working at heights, after all, we install overhead lifting solutions all the time, but there is a very real difference