Rows of steel coils should be stowed at least 4 to 6 inches (10 to 15 cm) apart to ensure the sides of coils are not damaged during loading, transit or
Cargo shipment of steel coil being loading or discharging by the workers stevedore man in the port under handle by the ship crane with the lorry trailer
The terminal can unload up to 25,000 metric tons of steel coils in just 24 hours. Two cranes, each of 100 mt capacity, perform up to 20 cycles per hour
summoned two volunteer stevedores to enter the hold with the necessary PPE, and, with the help of a shore crane, we started discharging the steel coils from
Cranes are needed for scrap handling, pig iron transportation, casting, forging and for transporting slabs and coils. Ladle Cranes. Ladle Cranes are used in two
The Paint Line is a new 274000 square foot building at SDI Columbus for a new paint line used for painting steel coils. The building consists of two crane
Stowing the coils this way avoids difficult loading and discharging procedures and the use of extra equipment, (forklifts, mobile hoisting cranes etc.)