Double deck crane for transporting steel vessels. Stowage of steel coils in port. horizontral industrial agency with cranes for transporting liners and
Rows of steel coils should be stowed at least 4 to 6 inches (10 to 15 cm) apart to ensure the sides of coils are not damaged during loading, transit or
The vessel discharging steel wire rods on truck at industrial port of thailand. modern lifting devices greatly facilitate the work of the people/move coil of
Crane handling best practices. (3.5). Minimum dimensions for wedges for coil storage. (4.4). Section for stowage of coils in Inland Waterway vessels. (7.4).
Valves located with stem in horizontal position shall be drilled and full line size (full port) [chromium plated brass] [316 stainless steel] balls [and