This 50t crane installed at the Pitt Street site was the 11th delivered by Eilbeck to the project and will serve as the mucking crane throughout the tunnel
A crane girder is a preformed metal beam on which the crab or hoist head of a traveling overhead crane runs. (Credit: Jonathan L. NW was taken down on March
KY 2262 over Ohio River and CS 1837 (East Second Street) minimum of 3 days prior to mobilization of equipment and installation of containment materials.