Worldwide planning, organisation and realisation of hoisting and crane technology projects for EPC contractors. EPC projects · Process crane with hoisting and
They operate along two rails (waterside and landside designations) spaced based on the size of crane to be used. Ship-to-shore crane elements. Lateral movement
The 1912 80-ton hammerhead Crane was ordered by Cowes specialist ability in the craft of rigging through such projects as the complete re-rigging of the.