Electromagnetic Bridge Crane with Carrier Beam (suspended beam parallel to main girder) ; Origin. China ; HS Code. 84261120 ; Production Capacity. 150 Sets Per
Electromagnetic Bridge Crane with Carrier Beam (suspended beam parallel to main girder) This bridge crane is a special product equipped with electromagnetic
Electromagnetic Bridge Crane with Carrier Beam (suspended beam parallel to main girder). 1.3-25 tons suspension type single girder overhead crane for goods
The carrier beam can be parallel to the main beam or perpendicular to the main beam of the crane; the magnetic cranes are with different lifting capacities
Carrier-beam Electromagnetic Crane spreader is electromagnetic carrier beam, carrier-beams with electromagnetic chuck under it, through electromagnetic
Runway- The rails beams, brackets, and columns on which a crane operates. Runway Conductors- The main conductors mounted on or parallel to the runway which
Overhead crane with electromagnetic beam is a specialized crane for lifting or parallel to main girder) and rotating beam (Upper beam or hanging beam).
Overhead cranes, top running, underhung, single or double girder and box girder A hoist travels between the runways and is suspended on the bridge beam
Find high quality and durable 5+5ton ~20+20 ton overhead magnet crane with magnet carrier beam parallel with main girder here with our company - one of the
Around 150 professors and educators from schools in the prefecture were in the area for a geological survey when a bolt bent and the suspension bridge collapsed
The utility model relates to a kind of hoisting crane, especially relates to a kind of pair of girder gauntry crane. Background technology. Weight-lifting
An overhead crane with electromagnetic beam spreader is commonly seen in steel plants beam) and non-rotating beam (vertical or parallel to main girder).
Construction of cable-stayed bridges usually follows the cantilever method Though suspension bridges can be made strong enough to support freight trains
nowadays double girder crane was increased because it was much more stable the main points are as follows: (1) double girder bridge crane lifting height