3. Partial replacement, turning and overturning repair method: When the damage occurs in the part of the part and the rest does not need to be repaired, cut off
Damaged jib was removed and stored on dock awaiting the vessel's return. Major repair work. New jib section shipped from the manufacturer. Damaged section cut
Due to the costs of a crane/hoists, replacement is not always an option. Engineered Lifting Systems specializes in repairing damaged cranes and hoists, and can